Our current project

Status: €2,700
Target: €4,000

Your donation will help the foundation to carry out an urgently needed investment project and provide better care for the many children and their families.

Project 3

Toilets and washing facilities (phase 1)

The children home has 3 bathrooms in total - just two with them are equipped with a shower. The facilities are in a desolate condition and not laid out to be used by up to 90 people on a daily basis. There are frequent problems with pipe obstruction, which makes the situation even worse. As a result, the kids have to get out of bed as early as 5 am in the morning to take turns to enter one of the bathrooms before going to school.

Improving the toilet and washing facilities will need a significant investment and the modifications may even require approval by local authorities. Therefore, we decided to break down the project into various phases. In the first phase of our project, we will focus on realizing the most urgent repairs in the existing bathrooms to alleviate the desperate situation in the short term.

  • IMG_0253
  • WhatsApp Image 2025-01-04 at 01.28.53
  • WhatsApp Image 2025-01-04 at 01.28.54
  • WhatsApp Image 2025-01-04 at 01.29.13
  • WhatsApp Image 2025-01-04 at 01.29.14
WHAT will THE donations BE SPENT ON?

The bathrooms will need to get some urgent fixes to improve water supply and to make sure that the water discharge pipes are working properly. Furthermore, some of the basic bathroom equipement needs to be replaced.