• Español
  • Deutsch
  • English
future4colombian.kids
  • About Us
  • Foundation
  • Projects
  • Q&A
  • Blog
  • About Us
  • Foundation
  • Projects
  • Q&A
  • Blog

Project Status II: Renovation of the Home Kitchen

By: Linus, 11/17/24 11:05 AM
Project Status

Here are some new updates for our donors on the progress of the kitchen renovation over the past two weeks:

The entire floor has been newly tiled:

WhatsApp Image 2024-11-09 at 21.30.35

The walls have been replastered and painted:

WhatsApp Image 2024-11-07 at 19.44.58

A new industrial stove has been purchased:

WhatsApp Image 2024-11-15 at 18.56.56

An outdoor waste disposal installation has been set up:

The work is proceeding well within the planned timeline, and we hope to share the first impressions of the completed kitchen with you soon.

Topics
  • Project Status
  • Background information
  • Foundation
  • Events
Popular Post
  • A tale of child poverty with a happy ending
  • Music with a mission
  • Behind the Scenes of One Hundred Years of Solitude
  • Advent Calendar 2024
  • What support is needed to help abused children?

Similar Blog Posts

Beyond laundry: Clean beds as a matter of dignity
Project Status I: Roofed laundry room
Project Status II: Roofed laundry room
Briefumschlag

info@future4colombian.kids

Eve

Düsseldorf, Deutschland

©2024 Future4ColombianKids. All rights reserved.
Imprint | Data Protection